Rip 

Eliminate Compaction

The most important step in achieving results on a revegetation project is ground prep. DTEC has the equipment to remove the compaction that develops on active job sites. Solid shank rippers with a six inch rip depth is the typical minimum, often DTEC rips to 12 inches to ensure a good seed bed and optimize the crimping of mulch. 

Copyright © 1995-2009. Down to Earth Compliance   p-303.306.1606  f-303.306.1765  info@trustdtec.com