Rip
Eliminate Compaction
The most important step in achieving results on a revegetation project is ground prep. DTEC has the equipment to remove the compaction that develops on active job sites. Solid shank rippers with a six inch rip depth is the typical minimum, often DTEC rips to 12 inches to ensure a good seed bed and optimize the crimping of mulch.


