I am expecting a regulator visit.

The Challenge

State regulators usually give more than 48 hours notice of a visit, but local regulators may simply drop in without any advance notice.

The Solution

DTEC will send an experienced Project Manager or Team Lead to join a regulator for a visit. This allows us to rapidly correct any issues spotted, and in some cases the solutions we propose to a regulator will be lower cost, more effective practices than their first impulse would suggest.

Contact Us


Unhappy with current provider?

The Challenge

If your current BMP contractor is letting you down in some way we can help.

The Solution

If needed we can take over a project mid-stream to correct poor installations and address lack of maintenance. More often, you might ride out the current project with our competitor, but resolve to do better on the next project.

Contact Us


My project just got a Notice of Violation

The Challenge

Responding to an NOV requires not only an effective response, but also airtight documentation of the actions taken.

The Solution

DTEC and sister company Summit have extensive experience in creating responses to NOV. A strong, appropriate response will resolve the matter without further need for regulatory action.

Contact Us


I need help in a hurry.

The Challenge

Although we all prefer a proactive approach, there are times when storms or regulators require a rapid response.

The Solution

DTEC has achieved a 48 hour or less response time of XX% in 2016. Many critical situations received responses the same day as the call was received.

Contact Us


I've got a complex project.

The Challenge

Complexity comes in many varieties. Examples include extremely large sites, projects with multiple builders working side by side, or high risk sites that are highly visible or in close proximity to waterways.

The Solution

At Leyden Rock DTEC provided a dedicated Project Manager and multiple crews who were on site two or more days a week. We worked closely with our client’s stormwater manager to prioritize responses and clarify which builders had responsibility for which areas. Working closely with Summit Services Group, we created highly organized and methodical response to constantly changing site conditions.

Contact Us


I need a second opinion.

The Challenge

Stormwater compliance is part art and part science and it is common to have different opinions about the most suitable response to erosion and sediment control challenges. ext filing.

The Solution

On site A, DTEC was asked to bid a substantial silt fence quantity. Upon review of the site, DTEC determined that because of topography and existing diversion ditches, no silt fence was required to meet city requirements. Our competitor happily gave them a bid for several thousands of dollars of silt fence that was not needed.

Contact Us

Wondering Exactly What We Do?

The Best Management Practices listed here are our most commonly requested services.

Silt Fence

Best when used on contour, usually on the perimeter of a project, always down slope from disturbed soils. Ask about our one year guarantee.

Wattle

This low profile sediment control is easy for foot traffic to step over without damage. Commonly seen in 9” and 12” diameter. Larger sizes available for special applications.

Inlet Protection

There are many different styles available. Often the style you use is determined by the local jurisdiction’s specifications. IP is your last line of defense before sediment leaves the site.

Big Reds/Heavyweight wattle

These branded products are durable, re-usable substitutes for wattle. They can also be moved and easily replaced to allow temporary vehicle access.

Erosion Control Blankets

ECBs provide immediate erosion control protection when installed and also create healthy growing conditions for native seed species to promote final stabilization.

Drill Seeding/Revegetation

Our preferred seeding method. Ask about our rapid response seeding crew for projects from a partial acre to 5 acres. We also have the big guns for projects up to hundreds of acres.

Concrete Washout

Several styles available including excavated pits. We will ensure that the style installed matches your SWMP plan.

Vehicle Tracking Pads

Traditionally these are rock surfaces that allow mud to fall off tires before a vehicle leaves the site. Manufactured options are becoming available for a more rapid installation.

Need a stormwater plan, permit, or inspections?

Our sister company Summit Services Group can help with that. Would you like it all under one contract or point of contact? We can do that, too.